Set Appliance State:

On/Off Switch OFF
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Ensure DHW storage cylinder is up to temperature
Gain access to PCB as necessary
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Appliance On/Off switch On.
Reset lockout as necessary.
All heating controls calling.
Measure voltage across connection 2 (black wire) and
connection 3 (blue wire) at connector J7 at the PCB.