Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Gain access to PCB (use Insulation Mat as required)

Observation:

Check if the pump is powered at the boiler from PL (and PN, see note) at the terminal block on the right side of the boiler.
Note:
Pump may only have a wire connected to "PL"
and the neutral is taken elsewhere.