Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Attach a temperature clamp on the CH flow pipe as near as possible to the appliance
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow the boiler to run with a CH demand until approximately 75°C and then remove the CH demand.
Monitor the appliance temperature and the pump, if the temperature exceeds 82°C the pump overrun should activate and operate as described on the previous page.
If the pump overrun does not activate when the temperature is above 82°C then the Aquastat PCB will need to be replaced.
Click here for the Aquastat PCB part number.