Set Appliance State:
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the AC voltage between the switch live supply (second terminal down) and neutral at the incoming mains supply terminals.
Expect mains voltage.
Is the voltage measured as expected?
Expect mains voltage.
Is the voltage measured as expected?

Isolate as per TOPs P4
and refit as necessary