Set Appliance State:
Mains Power Off
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the AC voltage between the pump live supply (top terminal) and neutral at the incoming mains terminal strip.
Expect mains voltage.
Is the voltage measured as expected?
Expect mains voltage.
Is the voltage measured as expected?

Isolate as per TOPs P4
and refit as necessary