Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Voltage Set meter to measure AC Volts
CH Demand
Control Thermostat in high position
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow the Boiler to purge itself and the Burner to ignite.
Measure the voltage across the connector (marked C1) connection 7 (purple wire) on the Main PCB and the Neutral wire (Blue) identified as N on the main connector block on the Interconnection Board.