Set Appliance State:

Mains Power Off
CH Demand
Control Thermostat in high position
High/Low Switch in Low position
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Observation:

After the Boiler has sequenced its purge period (approximately 10 seconds) sparking should occur and the Burner should ignite.