Set Appliance State:

Mains Power Off
CH Demand
Control Thermostat in high position
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Observation:

Allow the Boiler to sequence its purge period (approximately 10 seconds).
Can sparking be seen through the sight glass between the Spark Electrode and the Burner?