Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Control Thermostat in the Off position
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across connections marked PL (Brown wire, Pump Live) and PN (Blue wire, Pump Neutral) on the main connector block located on the Interconnection Board.

Isolate as per TOPs P4
and refit as necessary