Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Control Thermostat in high position
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Allow boiler to sequence its purge period (approximately 10 seconds) measure the voltage across connection 5 (White wire) on the Main PCB connector (marked as C1) and the Neutral wire (Blue) marked N on the main connector block located on the Interconnecting Board.
Note.
Voltage only present during spark sequence.
Voltage will cease when burner fails to ignite.
Note.
Voltage only present during spark sequence.
Voltage will cease when burner fails to ignite.

Isolate as per TOPs P4
and refit as necessary