Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Disconnect the spade connectors from the return thermistor and the X20 connector from the RHS of the PCB
Measurement:
Test for continuity of the black and blue wires 7th and 8th down from top on RHS of connector and the end of the harness.
Also inspect the harness for good overall condition,
no signs of shorting to the boiler casing etc.
Also inspect the harness for good overall condition,
no signs of shorting to the boiler casing etc.

Isolate as per TOPs P4
and refit as necessary