Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to Resistance Set meter to measure resistance
Gain access to the earth leads on the boiler

Measurement:

Test for continuity between the ends of all of the boilers earth leads and a suitable earth point.