Set Appliance State:
Mains Power Off
DHW Demand
Turn on the Hot water demand and make sure the cylinder stat is calling for heat
Gain access to the mains connector
Gain access to the mains connector
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage at the switched live input (R) and the Neutral (N) connections of the mains connector.
Is there voltage at the switched live connection now?
Expect 240VAC
Is there voltage at the switched live connection now?
Expect 240VAC

Isolate as per TOPs P4
and refit as necessary