Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to the mains connector by removing the retaining screw and lowering it through the bottom case
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage at the 'R' (switched live) and 'N' (neutral) connections of the mains connector.
Expect mains voltage.
Expect mains voltage.

Isolate as per TOPs P4
and refit as necessary