Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Close flow and return isolation valves
Discharge primary system water

Observation:

Confirm the expansion vessel charge pressure is correct.
(valve location top rear center)
Expected pressure 0.75 bar approximately.