Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove the connector plugs from the gas valve (violet and blue leads) and unplug the large (12 way) connector for the right hand side of the PCB
Measurement:
Check harness for continuity across the violet gas valve leads and blue leads at positions 6, 7, 8, & 9 at the PCB end to the gas valve connectors.
Check the general lead condition.
Check the general lead condition.

Isolate as per TOPs P4
and refit as necessary