Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure for mains voltage across brown and blue of ST4 pump connector on the PCB.
The connector is located at the back of the PCB beneath the pump.
The connector is located at the back of the PCB beneath the pump.

Isolate as per TOPs P4
and refit as necessary