Set Appliance State:
Mains Power Off
CH Demand
On/Off Switch On.
Gas On
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure Mains Voltage across the PCB Switched Live (Pink wire),
connection 1 and the Neutral (Blue wire), connection 3 on the PCB.
connection 1 and the Neutral (Blue wire), connection 3 on the PCB.

Isolate as per TOPs P4
and refit as necessary