Set Appliance State:
Mains Power Off
CH Demand
On/Off Switch On.
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
With Fan running measure Mains Voltage across the Black wire connection
7 (Pressure Switch connection NO) and the Blue wire connection 3
(PCB Neutral) on the PCB.
Note:
Test carried out at PCB (control box) not Air Pressure Switch.
7 (Pressure Switch connection NO) and the Blue wire connection 3
(PCB Neutral) on the PCB.
Note:
Test carried out at PCB (control box) not Air Pressure Switch.

Isolate as per TOPs P4
and refit as necessary