Set Appliance State:

Mains Power Off
Set Multimeter to AC Voltage Set meter to measure AC Volts
CH Demand
On/Off Switch On.
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure Mains Voltage across the pump terminal 3
(Orange wire, Pump live) and terminal 4
(Yellow wire, Pump neutral) on the main connector block.