Set Appliance State:
Mains Power Off
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the burner to ignite and run with a CH demand for 1 minute.
Remove the CH demand.
Does the pump continue to run for approximately 3 minutes.
Notes.
1. This setting is adjustable in the appliance parameter settings.
If the boiler does not behave as described above, it is advisable to check Parameter 2-3-7
2. The default setting is 3 minutes.
Click here for guidance on how to access / modify the parameters.
Alternatively refer to Adapt for guidance.
PUMP OVERRUN OPERATES AS EXPECTED
PUMP OVERRUN DOES NOT OPERATE AS EXPECTED
Remove the CH demand.
Does the pump continue to run for approximately 3 minutes.
Notes.
1. This setting is adjustable in the appliance parameter settings.
If the boiler does not behave as described above, it is advisable to check Parameter 2-3-7
2. The default setting is 3 minutes.
Click here for guidance on how to access / modify the parameters.
Alternatively refer to Adapt for guidance.
PUMP OVERRUN OPERATES AS EXPECTED
PUMP OVERRUN DOES NOT OPERATE AS EXPECTED