Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to boiler terminal block
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between the connections marked N and 2 at the boiler terminal block.
With no demand mains voltage should be absent.
With no demand mains voltage should be absent.

Isolate as per TOPs P4
and refit as necessary