Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to wiring connections for the
TR2 room stat and programmer PCB
TR2 room stat and programmer PCB
Measurement:
Confirm wiring between the boiler programmer module and
TR2 room stat is correct, in good condition and routed correctly?
Wiring connections should be as follows;
Terminal 3 on TR2 connected to terminal 3 on programmer.
Terminal 4 on TR2 connected to terminal 4 on programmer.
Terminal F on TR2 connected to terminal F on programmer.
The cable should not be routed close to other electrical cables, this can cause inductive interference (minimum separation 100mm).
TR2 room stat is correct, in good condition and routed correctly?
Wiring connections should be as follows;
Terminal 3 on TR2 connected to terminal 3 on programmer.
Terminal 4 on TR2 connected to terminal 4 on programmer.
Terminal F on TR2 connected to terminal F on programmer.
The cable should not be routed close to other electrical cables, this can cause inductive interference (minimum separation 100mm).