Set Appliance State:
Mains Power Off
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage between blue (7) on connector X401 and earth as power reinstated.
Expect approximately 17Vdc for the first 5 seconds after the boiler is powered on.
Is the voltage measured as expected?
Note:
If fused spur is not located near appliance the selector
switch can be used to turn appliance on and off.
Repeat test as necessary until complete.
Expect approximately 17Vdc for the first 5 seconds after the boiler is powered on.
Is the voltage measured as expected?
Note:
If fused spur is not located near appliance the selector
switch can be used to turn appliance on and off.
Repeat test as necessary until complete.

Isolate as per TOPs P4
and refit as necessary