Set Appliance State:
Mains Power Off
CH Demand
Note: Ensure boiler is cool
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Turn the boiler thermostat to OFF position.
Wait 10 seconds and turn boiler thermostat to calling position.
Does appliance start ignition sequence signifying lockout has reset?
Wait 10 seconds and turn boiler thermostat to calling position.
Does appliance start ignition sequence signifying lockout has reset?