Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to pump electrical connections, use isolation mat as required
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Is there mains voltage to the pump from the external controls?

Isolate as per TOPs P4
and refit as necessary