Set Appliance State:

Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Reset boiler if required.
Allow fan to run and ignition sequence to commence.
Measure the voltage at connector CN1 second from bottom (brown wire) on control PCB to a suitable neutral.
Approximately 8 seconds after the fan starts mains voltage should be present for 3 to 5 seconds. This should repeat 5 times before boiler locks out, with approximately 5 seconds between attempts.
Note:
Reset boiler as required until test is complete.