Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Disconnect the flow switch at the inline connector
Test to be carried on the connector leads that run to the flow switch
Note:
Flow switch is shown removed for illustration only
Test to be carried on the connector leads that run to the flow switch
Note:
Flow switch is shown removed for illustration only
Measurement:
Test 1.
Measure the resistance of the flow switch at the inline connector. Resistance should be open circuit.
Mains Power On.
Reset boiler if required.
CH demand.
Test 2.
Repeat test. Resistance should be closed circuit.
Measure the resistance of the flow switch at the inline connector. Resistance should be open circuit.
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Reset boiler if required.
CH demand.
Test 2.
Repeat test. Resistance should be closed circuit.

Isolate as per TOPs P4
and refit as necessary