Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use insulation mat as necessary)
Release the front facia by undoing the 2 screws at the top of the facia
Mains reset switch On
Release the front facia by undoing the 2 screws at the top of the facia
Mains reset switch On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage across the brown and blue leads on the mains reset switch.
Mains voltage expected.
Mains voltage expected.

Isolate as per TOPs P4
and refit as necessary