Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Remove the mains supply to the appliance from outgoing side of
the terminal strip (TO PCB) and make safe (left 3 terminals)
Replace mains fuse
the terminal strip (TO PCB) and make safe (left 3 terminals)
Replace mains fuse
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Does the mains power supply to the system establish or does the mains fuse blow again?
Isolate as per TOPs P4
and refit as necessary