Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
External controls calling for heat
Locate the gas valve harness connector on the PCB
(R/H side, back connector, black, brown and blue wires)
Gain access to PCB (use isolation Mat as required)
Locate the gas valve harness connector on the PCB
(R/H side, back connector, black, brown and blue wires)
Gain access to PCB (use isolation Mat as required)
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
WARNING! Be aware there are a set of 4 pins at the rear of the board that are live with mains voltage.
Reset boiler as necessary and allow ignition sequence to start and sparking to commence.
Test 1: Measure the voltage across the brown wire on the connector (back right) on the PCB and the blue neutral on the same connector.
Reset boiler as necessary and allow ignition sequence to start and sparking to commence.
Test 1: Measure the voltage across the brown wire on the connector (back right) on the PCB and the blue neutral on the same connector.

Isolate as per TOPs P4
and refit as necessary