Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Reset boiler as necessary.
Measure voltage between mains N and Pump Live connection (yellow wire) at the terminal block.
Mains voltage expected.
Note:
The pump being correctly wired into the boiler is essential to correct diagnosis for this test.
Measure voltage between mains N and Pump Live connection (yellow wire) at the terminal block.
Mains voltage expected.
Note:
The pump being correctly wired into the boiler is essential to correct diagnosis for this test.

Isolate as per TOPs P4
and refit as necessary