Set Appliance State:

Mains Power Off
CH Demand
Gas On
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Observation:

Reset boiler as necessary.
Allow boiler to fire and run with CH demand.
Does the CH system operate satisfactorily?