Set Appliance State:
Mains Power Off
CH Demand
Gas On
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Reset boiler as necessary.
Allow boiler to fire and run with CH demand.
Does the CH system operate satisfactorily?
Allow boiler to fire and run with CH demand.
Does the CH system operate satisfactorily?