Set Appliance State:

Mains Power Off
Set Boiler Control Thermostat to MAX position
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
External controls calling for heat
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow ignition sequence to commence and burner to establish.
Remove heating demand.
Measure the voltage across the pump live (connection marked P) and the pump neutral (connection marked PN) on the main connector block.
Mains voltage should be present for approximately 5 minutes after the demand for heating has been removed.