Set Appliance State:
Mains Power Off
NO Demands
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Test 1: Measure the DC voltage between pin 1 (Blue) on connector X25 and a suitable earth.
Expect approximately 24 Vdc.
Test 2: Measure the DC voltage between pin 2 (Red) on connector X25 and a suitable earth.
Expect approximately 24 Vdc.
Test 3: Apply a CH demand.
When the boiler reaches the sparking stage of the ignition cycle measure the DC voltage between pin 1 (Blue) on connector X25 and a suitable earth.
Expect approximately 0 Vdc
Expect approximately 24 Vdc.
Test 2: Measure the DC voltage between pin 2 (Red) on connector X25 and a suitable earth.
Expect approximately 24 Vdc.
Test 3: Apply a CH demand.
When the boiler reaches the sparking stage of the ignition cycle measure the DC voltage between pin 1 (Blue) on connector X25 and a suitable earth.
Expect approximately 0 Vdc

Isolate as per TOPs P4
and refit as necessary