Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
Gain access to PCB (use Insulation Mat as required)
Locate the system filling loop
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure the DC voltage between Pin 14 (Green) on X2
and the earth point on the boiler chassis.
Increase the system pressure slowly until the voltage measured reaches approximately 1.7 Vdc, this voltage corresponds to a system pressure of approximately 1 bar (see table below).
System pressureVoltage dc
0 bar1.2
1 bar 1.7
2 bar2.2
3 bar2.8