Set Appliance State:
Mains Power Off
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the DC voltage between pin 13 (Red) on connector X2 and the earth point on the boiler chassis.
Expect approximately 5 Vdc.
Note:
Each pin on the PCB connector is numbered.
Expect approximately 5 Vdc.
Note:
Each pin on the PCB connector is numbered.

Isolate as per TOPs P4
and refit as necessary