Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Disconnect the fan connector from the fan assembly
(place in a safe position)
On-Off switch on
(place in a safe position)
On-Off switch on
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the dc voltage between connector x20, connection 4 (grey) and a suitable earth.
Expected voltage approx. 24vdc.
Note:
Voltage will be present after approx. 10 seconds after the pump starts.
Expected voltage approx. 24vdc.
Note:
Voltage will be present after approx. 10 seconds after the pump starts.

Isolate as per TOPs P4
and refit as necessary