Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
System discharged

Observation:

Check the expansion vessel charge pressure.
It should be approximately 1 bar.
Note:
The expansion vessel will be remote to the boiler and not an integral part of the boiler.