Set Appliance State:
Mains Power Off
Ensure NO demands
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
1) With NO demand does the fan run continuously?
Set temperature control to MAX and apply a CH demand:
2) With a CH demand does the fan run?
Note:
The appliance may take about 12 seconds for the fan to run.
Set temperature control to MAX and apply a CH demand:
2) With a CH demand does the fan run?
Note:
The appliance may take about 12 seconds for the fan to run.