Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove control box cover
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure for mains voltage across terminals marked L (live) and N (neutral)
at the main terminal strip.
Expect mains voltage.
at the main terminal strip.
Expect mains voltage.

Isolate as per TOPs P4
and refit as necessary