Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Flow and return isolation valves closed
Discharge the primary water from the boiler (Refer to Adapt for guidance)

Observation:

Confirm the expansion vessel charge is correct ?
Expected pressure should be approximately 0.75 bar.