Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Disconnect eBUS wiring and make safe
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

With the eBUS controls disconnected does the boiler respond to a CH demand?
Note:
Ensure the wire link that should be fitted between terminals 3 and 4 when using eBUS controls is correctly in place.