Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (Use insulation mat as necessary)
Mains reset switch On
Mains reset switch On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage across the live (brown lead) and neutral (blue lead) connection on the connector marked H1 on the main PCB.

Isolate as per TOPs P4
and refit as necessary