Set Appliance State:
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset appliance if required.
(press and hold the power button for 4 seconds then release)
Allow the fan to run and the ignition sequence to commence.
Monitor the DC voltage to the gas valve during the ignition cycle, 16 Vdc or greater should be present during the sparking stage of the ignition cycle.
Is the voltage measured as expected?
Note:
Appliance will attempt to ignite 5 times before lockout, reset as necessary to complete the test.
(press and hold the power button for 4 seconds then release)
Allow the fan to run and the ignition sequence to commence.
Monitor the DC voltage to the gas valve during the ignition cycle, 16 Vdc or greater should be present during the sparking stage of the ignition cycle.
Is the voltage measured as expected?
Note:
Appliance will attempt to ignite 5 times before lockout, reset as necessary to complete the test.

Isolate as per TOPs P4
and refit as necessary