Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset appliance if required (press reset button for 2 seconds and release).
When the fan starts measure for DC volts across pin 3 (Orange lead) connector X20 and a suitable earth connection.
Expected voltage approximately 5.5 Vdc.
Note.
1. Ensure a good connection is made or misdiagnosis may occur.
2. It may take approximately 40 seconds for the boiler to recognise
a demand, this will depend upon the boiler status.
(Status code guidance CLICK HERE)
3. Appliance may enter lockout during test reset appliance as required
until test complete.
When the fan starts measure for DC volts across pin 3 (Orange lead) connector X20 and a suitable earth connection.
Expected voltage approximately 5.5 Vdc.
Note.
1. Ensure a good connection is made or misdiagnosis may occur.
2. It may take approximately 40 seconds for the boiler to recognise
a demand, this will depend upon the boiler status.
(Status code guidance CLICK HERE)
3. Appliance may enter lockout during test reset appliance as required
until test complete.

Isolate as per TOPs P4
and refit as necessary