Set Appliance State:

Mains Power Off
CH Demand
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Reset appliance if required (press reset button for 2 seconds and release).
When the boiler has recognised a CH demand (radiator symbol flashing),
does the pump run?
Note.
It may take approximately 40 seconds for the boiler to recognise
a demand (radiator symbol flashing), this will depend upon the boiler status.
(Status code guidance CLICK HERE)