Set Appliance State:
Mains Power Off
CH Demand
Wait 60 seconds before powering back on as the link between the interface and
main PCB can be disrupted if it is done too soon
main PCB can be disrupted if it is done too soon
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Powering the appliance off and then on will interrupt any anti-cycle or pump overrun programs.
Apply a demand, does the Fan run?
(The fan can take up to 20 secs to start)
Apply a demand, does the Fan run?
(The fan can take up to 20 secs to start)