Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
CH Demand
Gain access to PCB (use Insulation Mat as required)
Gas On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Ensure external controls are calling for heat and allow the boiler to enter its ignition sequence.
During the ignition sequence monitor the voltage to earth on the white wire at pin 9 of PCB connector X20.
Once the fan starts there should be approx. 13Vdc at the White wire.