Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
Ensure there is no demand from the external controls
Ensure there is no demand from the external controls
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure AC voltage to earth at Pin-4 (White wire)
of connector X17.
Is there Mains voltage found?
of connector X17.
Is there Mains voltage found?

Isolate as per TOPs P4
and refit as necessary